Defaults and data
Repair times are set per plant type, since a type C plant with little in-house engineering takes longer on the same job. Change them here and every plant follows unless you have overridden it individually.
National totals, at the settings below
Plants
One row per plant. Switch a unit off and the products recalculate immediately. Open a plant to set the date of the last strike on each unit and to see how long its repair has left to run.
Six months ahead
Damage arrives at the tempo you choose, spread across plants by reach and size, and each unit comes back on its own repair clock. This is a projection of the bench, not of the Lab: it has no demand side, no imports and no rationing. It answers one question only, what the plants will be able to make.